Can You Build a Granny Flat Without a DA?

It depends on your state, block size, and design. Here’s the latest breakdown:

StateMax Size Without DAKey Exemption Conditions2024 Changes
NSW60m²– Complying Development (CDC) eligible
– Min. lot size: 450m²
– 3m from rear boundary
New 7-star NatHERS thermal efficiency rule
QLD80m²– “Self-assessable” in most zones
– 1.5m side/rear setbacks
– No flooding overlays
Must use QBCC-approved designs
VIC❌ DA always required– Even for 50m² flats
– Needs planning permit (unless existing secondary dwelling rights)
Faster permits for regional areas

✅ NSW: Use a private certifier for CDC (approval in 20 days vs. 70+ for council DA).
✅ QLD: Download pre-approved granny flat plans from QBCC.
✅ VIC: Book a pre-application meeting with council to flag issues early.

1. New South Wales (NSW) – Complying Development (CDC) Pathway

Exemption: Granny flats up to 60m² can avoid full DA via Complying Development Certificate (CDC) if meeting strict criteria.
Key Requirements:

  • Minimum lot size: 450m²

  • Maximum height: 3.5m

  • Setbacks: 0.9m from side/rear boundaries
    Official Source:

  • NSW Planning Portal – Granny Flat Rules

  • CDC Technical Standards (Part 3A)

Critical Note: Even CDC projects require shadow diagrams and BASIX certificates.


2. Queensland (QLD) – Self-Assessable Development

Exemption: Granny flats up to 80m² may qualify for “self-assessable” status (no DA) in residential zones.
Key Requirements:

  • Must use QBCC-approved designs

  • Max height: 4.5m

  • Setbacks: 1.5m from boundaries
    Official Source:

  • QDCP Code for Granny Flats (MP3.10)

  • QBCC Self-Assessable Checklist

Watch Out: Flood, heritage, or bushfire overlays remove self-assessable status.


3. Victoria (VIC) – No Exemptions

Reality Check: VIC requires a planning permit for all granny flats, regardless of size.
Key Loophole: Some properties with “existing secondary dwelling rights” may skip permits.
Official Source:

  • VIC Planning – Small Second Dwellings

  • Find Your Council’s Rules

When Exemptions DON’T Apply

Even if your state allows exemptions, you’ll need a DA if your block has:

  • Heritage overlays (e.g., Sydney’s Inner West)

  • Bushfire BAL-40+ ratings (requires flame-resistant materials)

  • Sewer lines under the build area (Sydney Water approval needed)

Pro Tips to Avoid DA Delays

Not all DA documents are created equal. This guide separates:
🔴 Universal requirements (like shadow diagrams – needed for EVERY application)
🟡 Conditional documents (only needed in specific scenarios)
🟢 Optional but recommended (protects you from future headaches)


The Document Hierarchy

1. UNIVERSAL REQUIREMENTS (All Applications)

a. Shadow Diagrams

  • Why Critical: Councils reject 30% of applications with inadequate shadow studies.

  • Key Details: Must show shadows at 9AM/12PM/3PM on winter solstice (June 21).

  • Tool: Use SunCalc for free basic modeling.

b. Site Plan

  • Minimum requirements: Property boundaries, existing structures, and proposed granny flat location.


2. CONDITIONAL DOCUMENTS (Only When Applicable)

DocumentTriggering ScenariosCost-Saving Tip
Stormwater PlanBuilding near sewer lines/stormwater drainsReuse your house’s drainage report if recent
Bushfire BAL ReportProperties in bushfire-prone areas (check state maps)Bundle with your main dwelling’s assessment
Acoustic ReportWalls within 1m of boundaryPre-approved designs often include this
Driveway ApprovalAny new/modified vehicle accessApply separately 6 weeks before DA submission

3. OPTIONAL BUT RECOMMENDED

  • Neighbor Consent Letters: Not required but prevents objections

  • Soil Test: Only mandatory for unstable sites, but prevents future foundation issues

  • Construction Timeline: Helps avoid “stalled project” penalties


Why Shadow Diagrams Dominate DA Reviews

  • NSW Case Study: Blacktown Council rejected 112 granny flat DAs in 2023 primarily for:

    • Missing 3PM shadow modeling (87 cases)

    • Underestimating shadow lengths by using summer sun angles (25 cases)

  • Pro Tip: Pay a draftsperson $200-400 for compliant diagrams rather than risking rejection.